Click here for Cameco Investment

"This agreement strengthens our efforts to identify new uranium reserves for the future. Cameco gains the right to participate in the exploration of new regions and adds the expertise of a solid technical team to our knowledge base."

Cameco President & CEO on UNOR investment

Why UNOR?

 

Last Price: 0.06 Change: 0.01 Volume: 128500

Delayed quote for UNI - UNOR Inc.
For details, please click here.

Coppermine 3-Dimensional Model

The Coppermine Block 3-D Geological Model (2005) illustrates the way in which geologists design and advance the exploration and drilling program, by using data integration. Different types of spatial data such as structural data, geochemical data, drilling logs, and data derived from the interpretation of geophysical surveys are plotted in the 3-dimensional space. Then, main features such as rock formations contacts, faults, geophysical and geochemical anomalies are analyzed together interactively.

In order to simplify the presentation, the movie shows only a few of the datasets involved in the modeling at the time. The yellow blobs which appear on the surface represent prospective targets for follow-up with ground geophysical surveys or drilling. They indicate areas where several favourable conditions for uranium concentration come together – fault and lineament intersections, relatively shallow basement depth, surface geochemical anomalies, etc.

Click here to download the complete model as a QuickTime Movie - 12 MB file.